Call us!

Mobile/Whatsapp/Wechat:
+86 15123029885

Write to us!

Home » Products » High Voltage Tester » Primary Injection Tester » SLQ Series 500A To 10000A Primary Current Injection Test Set High Current Generator

loading

Share to:
sharethis sharing button

SLQ Series 500A To 10000A Primary Current Injection Test Set High Current Generator

SLQ Series 500A To 10000A Primary Current Injection Test Set is for electrical debugging to generate high current.
It is widely used in power plants, power distribution stations, electrical plants, scientific research, laboratories and other units.
Availability:
Quantity:
  • SLQ

  • GOLD

  • SLQ

SLQ Series 500A To 10000A 

Primary Current Injection Test Set High Current Generator


Primary Current Injection Test Set (3)

Introduction


  • SLQ Primary Current Injection Test Set is an essential equipment used for electrical debugging to generate high current, which be widely used in power plants, power distribution stations, electrical plants , scientific research, laboratories and other units.

  • The SLQ series high current generator is a current source used for inspection. As low-voltage and high-current sources for thermal and dynamic stability of electrical appliances, such as temperature rise test and tripping of air circuit breakers, contactors, and relays, etc.

  • SLQ High Current Generator is a short-term or intermittent work device and characterized by small size, light weight, good performance, easy use and maintenance.


Features


  • Two ammeters, can supervise different measurement range.

  • With indicator lighting and button, easy to operate

  • Incorporated and dividable structure, easy to move.

  • Working time: short-time work (Continuous work can be customized)

       At rated output: working time is 2.5 minutes;

       At 1/2 rated output: working time is 30 minutes;

       When 1/3 rated output: working time is 40 minutes;

      When 1/4 rated output: long-term use;

       The capacity of the equipment is designed according to the 5-minute short-time work system. When used for intermittent work, the power-on time is less than 2.5 minutes, and the working period should be greater than 10 minutes. Its specifications and technical parameters are as follows:


Model Selection


Model Output Current(A) Capacity(kVA) Output Voltage(V)
SLQ-2/500 500 2 4
SLQ-4/1000 1000 4 5
SLQ-10/2000 2000 10 4
SLQ-12/3000 3000 12 4
SLQ-16/4000 4000 16 4
SLQ-20/5000 5000 20 4
SLQ-24/6000
6000 24 4
SLQ-32/8000 8000 32 4
SLQ-40/10000 10000 40 4

Remark:

  1. Normally, if the output current is above 4000A, We will provide split design. If you have special requirements, we can also customization.

  2. The capacity and maximum current output could be customized according to the requirements of customer if you can not find the one you need in this table.


Primary Current Injection Test Set (7)

Primary Current Injection Test Set (6)Primary Current Injection Test Set (4)

Our Partners



Partners

Contact Us


Contact Person: Christine Gou

Whatsapp/Wechat: +86 15123029885

Mobile: +86 15123029885

E-mail: gold05@hy-industry.com


Previous: 
Next: 
Product Inquiry

QUICK LINK

PRODUCT LIST

CONTACT US

Phone : +86 15123029885
Add : Technical Central Building,Eco &Tech Dep Zone, Nan'an District, Chongqing,China
E-mail : gold05@hy-industry.com
Fax : 0086-23-62940030
Whatsapp : +8615123029885
Wechat : + 8615123029885
Copyright  Chongqing Gold Mechanical&Electrical Equipment Co.,Ltd. All rights reserved. Site Map
公安备案号 50010802002590